S&P Global Offerings
Featured Topics
Featured Products
Events
S&P Global Offerings
Featured Topics
Featured Products
Events
S&P Global Offerings
Featured Topics
Featured Products
Events
S&P Global Offerings
Featured Topics
Featured Products
Events
Our Methodology
Methodology & Participation
Reference Tools
S&P Global
S&P Global Offerings
S&P Global
Research & Insights
Our Methodology
Methodology & Participation
Reference Tools
S&P Global
S&P Global Offerings
S&P Global
Research & Insights
Coal, Metals & Mining Theme, Metallurgical Coal, Ferrous
August 16, 2023
Platts, part of S&P Global Commodity Insights, will launch a new open origin daily assessment for CFR India Mid-Vol Pulverized Coal Injection (PCI), effective Aug. 21, in response to increasing demand for spot import prices as the India market evolves amid changes in global trade flows.
Platts first proposed the new assessment on Aug. 1. The subscriber note can be found at: https://www.spglobal.com/commodityinsights/en/our-methodology/subscriber-notes/080123-platts-proposes-new-open-origin-cfr-india-mid-vol-pulverized-coal-injection-assessment
Feedback received from market participants confirmed the relevance of capturing PCI flows beyond the Australia exports reflected in the existing net forward assessment, after India's development into a major destination for various origins of spot metallurgical coal.
Currently, Platts publishes a CFR India Mid-Vol PCI daily price (Symbol: MCVAI00) calculated on a net forward basis to the benchmark FOB Australia Mid-Vol PCI daily spot assessment (Symbol: MCLAA00). MCVAI00 and its associated monthly average (Symbol: MCVAI03) will remain in place after the new assessment's launch.
The specifications for the new assessment are:
| Assessment Name | Mid-Vol PCI CFR India Open Origin |
| Symbol for daily assessment | AMDVA00 |
| Symbol for associated monthly average | AMDVA03 |
| Quality | 19% Volatile Matter, 10% Ash, 0.5% Sulfur, 78 Hardgrove Grindability Index, 10% Total Moisture, 1 Crucible Swelling Number |
| Quantity | Minimum 30,000 mt |
| Location | Delivered East India, Paradip |
| Laycan Timing | Delivered 20 to 65 days forward from publication date |
| Unit of Measure | $/mt |
| Payment Term | LC at Sight |
| Time Stamp | Singapore Publishing Schedule, Market Close 5:30 pm Singapore time daily |
Platts Metallurgical Coal assessments are published in SBB Steel Markets Daily, Coal Trader International, Coal EU Daily and Coal US Daily on the real-time Platts Steel and Raw Materials Alert, and in Platts Market Data.
Details on Platts Metallurgical Coal assessments can be found here: https://www.spglobal.com/commodityinsights/en/our-methodology/methodology-specifications/coal/metallurgical-coal-methodology
Please send questions and comments to PL_CokingCoal@spglobal.com and PriceGroup@spglobal.com.
For written comments, please provide a clear indication if comments are not intended for publication by Platts for public viewing. Platts will consider all comments received and will make comments not marked as confidential available to the public upon request.