07 Jul 2016 | 01:49 UTC — London

SUBSCRIBER NOTE: Clarification of methodology for LNG freight route costs

Platts seeks to clarify the methodology for its LNG freight route costs following a printing error in the LNG Methodology and Specifications Guide relating to the voyage times for two freight routes.

Please note that the Platts voyage time as printed in the methodology guide for the following 2 routes is incorrect:

Sabine PassArgentina, 13 days Sabine PassBrazil, 17 days

The correct days should read as follows: Sabine PassArgentina, 17 days Sabine PassBrazil, 13 days

However, this does not affect current calculations within the Shipping Calculator and Freight Route Costs as the assumptions are correct and only printed in error in the methodology guide.