06 Jul 2021 | 17:17 UTC

Platts corrects 2021 Guarantees of Origin prices for July 5

S&P Global Platts has corrected Nordic Hydro (NHGY004), EU Wind (EWGY004), EU Solar (ESGY200) and EU Biomass (EBGY200) for 2021 contracts for July 5, 2021.

Nordic Hydro 2021 (NHGY004) to Eur0.47/MWh

EU Wind 2021 (EWGY004) to Eur0.47/MWh

EU Solar 2021 (ESGY200) to Eur0.515/MWh

EU Biomass 2021 (EBGY200) to Eur0.45/MWh

As a result, hydrogen price assessments for July 5 and Coal Trader International, Bunkerwire and US Gas Daily reports have been corrected.

Hydrogen Netherlands Alkaline Electrolysis MA (HONMA00) to 4.7153 Eur/kg

Hydrogen Netherlands Alkaline Electrolysis (incl CAPEX) MA (HSNMA00) to 5.417 Eur/kg

Hydrogen Netherlands Alkaline Electrolysis (incl CAPEX) MA (HPNMA00) to 0.1625 Eur/kWh

Hydrogen Netherlands PEM Electrolysis MA (HMNMA00) to 5.4442 Eur/kg

Hydrogen Netherlands PEM Electrolysis MA (HNNMA00) to 0.1633 Eur/kWh

Hydrogen Netherlands PEM Electrolysis (incl CAPEX) MA (HQNMA00) to 6.7014 Eur/kg

The corrected values are available on request in an Excel file format.

Further information is available by emailing power@spglobal.com, copied to pricegroup@spglobal.com.