27 Feb 2015 | 10:00 UTC — London

SUBSCRIBER NOTE: Platts corrects Dutch peakload power assessments

Platts has corrected its February 27 trade-date peakload power assessments of Dutch day-ahead (AADMG00) and day-ahead plus 1 (AADMG27). Values were incorrectly posted for the Saturday and Sunday peakload contracts. Under the corrected data, there are no assessments for Saturday and Sunday peakload. The assessment of Monday peakload is Eur49.75/MWh-Eur50.25/MWh, as originally posted. Platts has also removed data posted in error for Dutch day-ahead plus 4 peakload (AADMG30). Associated Dutch peakload power flow-date data under the symbol AADMG21 has also been removed.

The assessments are published on European Power Alert page 52, in Platts Market Data category EE and in European Power Daily.