20 Apr, 2026

CAISO selects LS Power to develop 230-kV transmission line in Bay Area

The transmission line, which has a required in-service date of June 1, 2030, will connect Silicon Valley Power's Northern Receiving Station substation to Pacific Gas and Electric's San José B substation.