30 Apr, 2026

Northland Power secures 30-year PPA for output of Taiwan offshore wind farm

Northland intends to switch the 294-MW Hai Long 2A site to a new PPA with Taiwan's TSMC, contracting the semiconductor manufacturer to buy the Hai Long project's entire 1,022 MW of generating capacity.